top of page
Search

Do I Need a Permit to Build a Pool in Lee or Charlotte County, Florida?

  • Matthew Groff
  • Jun 8
  • 2 min read

Updated: Jun 20


Pool Permits in Lee & Charlotte County Florida | Vista Mar Pools


Learn what permits are required to build an inground pool in Lee or Charlotte County, FL. Vista Mar Pools handles everything—permits, inspections, and approvals.



ree



Do I Need a Permit to Build a Pool in Lee or Charlotte County, Florida?


If you're planning to build a pool in Southwest Florida, one of the most common questions is:“Do I need a permit?”The short answer is: yes — and there’s a process behind it.

At Vista Mar Pools, we make it simple. We manage all the necessary permits, inspections, and approvals for your pool project, so you don’t have to worry about red tape.

Here’s what you need to know.


Why Are Pool Permits Required in Florida?


Building a pool is a major construction project that involves:

  • Excavation

  • Plumbing

  • Electrical wiring

  • Structural safety

  • Zoning compliance


Local governments require permits to ensure every project meets Florida Building Code, municipal guidelines, and health & safety standards — especially in flood-prone or coastal areas like Lee and Charlotte counties

.

What Permits Do I Need to Build a Pool?


Depending on the scope of your project, the following permits may be required:


🏊‍♂️ Swimming Pool Construction Permit

Covers structural, location, and safety code compliance.

Electrical Permit

Required for pool pumps, lighting, automation systems, and bonding.

🚿 Plumbing Permit

Covers pool filtration, drainage, and spa-related plumbing.

🏠 Screen Enclosure Permit (if adding a lanai)

Needed for your screened pool cage or covered lanai enclosure.

🧾 Septic System Review (if applicable)

Ensures pool placement does not interfere with septic tanks or drain fields.

📍 Each city (like Fort Myers, Cape Coral, Punta Gorda) may have slightly different permitting layers — and we’re familiar with them all.


Who Handles the Permit Process?


At Vista Mar Pools — we do.

We take care of:

  • Completing and submitting all applications

  • Communicating with city or county building departments

  • Scheduling all required inspections

  • Responding to any plan reviews or code comments

You stay informed — but we handle every step.


H2: How Long Does the Permit Process Take?

Typical permit timelines in 2025 (may vary by location):

County

Average Approval Time

Lee County

2–4 weeks

Charlotte County

3–5 weeks

Permit times can fluctuate due to:

  • Volume of applications

  • Backlogs from storms or holidays

  • HOA approvals (if required)

  • Missing documentation (which we work to avoid)

We submit plans early and accurately to keep your build on track.


Avoid Delays and Build With Confidence


Hiring a builder who knows the system is key to keeping your pool project stress-free.

At Vista Mar Pools, we’re experienced in:

  • Lee County and Charlotte County code requirements

  • Engineering plans and inspections

  • Building within flood zones and wind zones

  • Fast-tracking jobs through proper planning


Let Us Handle the Paperwork — You Enjoy the Pool


Permits shouldn't slow you down. With Vista Mar Pools, they won’t.

Whether you’re in Fort Myers, Cape Coral, Punta Gorda, or beyond — our team takes care of the details, documents, and deadlines so you can focus on what matters: enjoying your new pool.

👉 Contact Vista Mar Pools today for a free site evaluation and permit-ready design consultation.


 
 
 

Comments


© 2035 by Vista Mar Pools. Powered and secured by Wix

bottom of page